PROJECT:
TORAY COMPOSITES (AMERICA), INC.  
SITE:
19002 5OTH AVENUE EAST
TACOMA, WASHINGTON 98449
PROGRAM:
TORAY COMPOSITES
COST:
$6,500,000
image1

Livermore Associates provided building design services for the Toray Composites (America) TCA-4 expansion in Tacoma, Washington. The approximately 45,000 square foot expansion provides space for an additional production line. Office space, lunchroom and locker room facilities are also included in the expansion.

The building structure at the production area production area expansion consists of steel framing with a metal-clad insulated wall panel exterior skin. Tilt-up concrete construction is utilized at the office expansion area. Equipment foundations and pits are included in the expansion.

Approximate cost of building construction improvements is $6,500,000. The expansion increases the total building area to approximately 150,000 square feet.